Term 2
Week 1
The laptop I mention earlier arrived at the end of the break
and I will be using the new computer from now on as the older computer was
having trouble meeting the project demands which made it constantly lag and
crash at times. Loading time was also a major problem with the original
computer and the current new computer shows none of these problems. I have also
notice a significant improvement in working pace thanks to the SSD (solid state
drive) I choose to include into the customization of this laptop instead of a
HDD (hard disk drive. Opting for flash memory has significantly speeded up the
data reading process when opening and importing files.
Rope work sides, mast and yards
Created cylinders as ropes and positioned them according to
the plans onto the ships structure. I left out many details in this section as I
felt it unnecessary to include due to its scale in the overall model would make
it difficult to see or notice. Things that I left out included some know,
rigging equipment like hooks and gears and much more.
The knots and rope holders were made by making a single one
and duplicating and rotating them into place. Individual ones that feature some
differences were changed separately.




No comments:
Post a Comment