Sunday, 2 December 2012


Week 9


Ship front internal details

The internal structure for the front of the ship was made based on the previously top front detail plans. The main problem whilst making this part was the different planes didn’t match making parts of the shape stick in areas where it was supposed to be seen. Therefore areas for this had to resize and repositioned after the structure was made inside the front inside of the ship.

No comments:

Post a Comment